Safety Through Innovation · Made in the USA

Emergency shower inspection app for plumbed, self-contained and combination units. The Odiz App checks each shower against OSHA 29 CFR 1910.151(c): present where workers may be exposed to corrosives, within the work area, unblocked, activating and flowing, with intact parts and room to stand under the head. Results are dated and the next check is due monthly.
Request information
OSHA requires quick drenching facilities wherever a person's body may be exposed to injurious corrosive materials. The Odiz App checklist references these rules and defaults to a monthly inspection.
Quick Drenching Facilities
Construction Drenching Facilities
Shower Performance Standard
Default Inspection Frequency
Problems found at emergency showers, and the checklist items that catch them.
Blocked Access
Carts, pallets, stored materials or locked doors that block or delay the path to the shower.
No Flow on Activation
Showers that produce no flushing fluid when activated, such as when a supply valve is shut off or the line is disconnected.
Broken Components
Missing pull handles, damaged shower heads, disconnected piping or valves that no longer operate.
Out of Reach
Showers outside the work area, or on a different level from where corrosives are handled, that delay immediate use.
No Room to Stand
Equipment or storage around the shower that leaves no clear space to stand under it and activate it.
Bottles Instead of a Shower
Personal wash bottles or small flushing containers relied on as the only facility where body exposure to corrosives calls for drenching equipment.
Corrosive chemicals keep damaging skin for as long as they stay in contact with it. An emergency shower only helps if it is reachable, unobstructed and working at the moment someone needs it, and a worker who has just been splashed has no time to look for another unit.
Showers in quiet corners of a plant can go months without use while valves get closed, handles get removed and storage creeps into the clear space. A regular, dated inspection helps confirm each shower is still ready for immediate emergency use under 1910.151(c), and shows when it was last checked and by whom.
Key requirements cited in the Emergency Shower checklist.
Quick Drenching or Flushing
Where the eyes or body of any person may be exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body are provided within the work area for immediate emergency use.
Construction Sites
The construction medical services and first aid rule carries the same quick drenching or flushing requirement for corrosive exposures on construction work.
Access and Location
OSHA interpretation guidance informs the checklist items on blocked or locked access, placement on the same work level and not relying on personal wash bottles alone.
Performance Guidance
The consensus standard OSHA refers to for emergency shower and eyewash equipment. It covers performance and maintenance topics such as weekly activation of plumbed units, flushing and a reachable, unobstructed location.
A consistent way to inspect every emergency shower on site and follow up on what fails.
QR Tag on Each Shower
Scan the tag or enter the Equipment ID in Equipment Lookup to open the shower's record and checklist.
Catalog Auto-Fill
When a shower model has been added before, the add-equipment wizard fills in its model details from a shared catalog.
Photos of Defects
Failed items require a photo, a description and a recommendation.
Tracked Fixes
Each failure becomes a corrective action with an assignee, a due date and a verification step before it closes.
Due Date Tracking
Upcoming and overdue shower inspections show on the To-Do list and in the Daily Overdue Inspection Digest email.
PDF Reports
Each completed inspection produces a PDF report stored with the shower's history and in Reports.
Keep a dated history of every emergency shower inspection, with the inspector's name on each record.
Common questions about emergency shower inspections in the Odiz App.
29 CFR 1910.151(c) requires suitable facilities for quick drenching or flushing of the eyes and body within the work area for immediate emergency use wherever a person may be exposed to injurious corrosive materials. 29 CFR 1926.50(g) sets the same requirement for construction.
Emergency showers default to a monthly inspection, and the next due date is set from that frequency after each submission. ANSI/ISEA Z358.1 describes weekly activation of plumbed units, and an inspection can be started at any time from Equipment Lookup.
Both. One item requires activating the shower and confirming it produces flushing fluid, another confirms the fluid reaches the body area it is meant to drench, and others cover the head, piping, pull handle and valve. The checklist does not measure flow rate or water temperature.
When a shower is added, the Shower Type field records whether it is plumbed, self-contained, a combination unit or unknown. Items that do not apply to a unit can be marked N/A.
A failed item requires a photo, a description and a recommendation, and it flows into Corrective Actions as a finding with an assignee and a due date. The checklist also has an item confirming that a defective shower is removed from service, repaired or otherwise corrected.
Yes. The Odiz App includes a read-and-sign training module on emergency showers, and completed modules are added to each worker's training record.
An emergency shower is used in the first seconds after a corrosive splash, so a blocked, shut-off or broken unit is usually discovered at the worst possible time. The Emergency Shower inspection in the Odiz App checks each shower against the quick drenching requirement in OSHA 29 CFR 1910.151(c) and records who inspected it and when.
Add each shower in the app with its location and shower type, and fix a QR tag to the unit. At inspection time, scan the tag in Equipment Lookup, activate the shower, look over the area and the hardware, and answer each item Pass, Fail or N/A. Inspections can be assigned to one or more people, and any assignee can complete them.
The result is dated, recorded with the inspector's name and saved to the shower's inspection history with a PDF report, and the next due date is set from the monthly default frequency. Failed items become findings in Corrective Actions with an assignee, a due date and a verification step. For standalone eyewash units, see Eyewash Station inspections; to track the corrosive chemicals on site, see Chemical Management and SDS.
The checklist references OSHA 29 CFR 1910.151(c), which requires suitable facilities for quick drenching or flushing of the eyes and body within the work area for immediate emergency use where a person may be exposed to injurious corrosive materials, and the matching construction rule, 29 CFR 1926.50(g). Several items also draw on OSHA interpretation guidance on access and location. ANSI/ISEA Z358.1, the consensus standard OSHA refers to for emergency shower performance, covers topics such as weekly activation of plumbed units, flushing and a reachable, unobstructed location. The checklist confirms activation and flow; it does not measure flow rate or water temperature.

Air receiver inspection app for compressed air tanks and pressure vessels. The Odiz App checks each receiver a…
Request quote
SKU ODIZ-15482

Ladder inspection app with a digital checklist for monthly ladder inspections. Scan each ladder’s QR tag, reco…
Request quote
SKU ODIZ-7961

Rolling scaffold inspection app for rolling scaffolds and mobile scaffold towers. Record tower type, platform …
Request quote
SKU ODIZ-7974

Forklift inspection app for daily pre-use checks on powered industrial trucks. The Odiz App follows the examin…
Request quote
SKU ODIZ-15492